Home2026-09-09T14:15:40+02:00

LATEST
SI-ALPINE

When do snowmakers actually run?

Snowmaking & Slope Maintenance|

For the first time, TechnoAlpin evaluated anonymized operational data from 13,129 snowmakers across 112 Austrian ski resorts. The result: during the 2025/26 winter season, the systems were in operation for an average of 169 hours. Forty percent of the total snow produced was generated in just six days during November – the brief window in which the base snow layer for the season was established.

Inauen-Schätti: Avalanche protection is revenue protection

Planning & Construction, SI World 2/2026, Snowmaking & Slope Maintenance|

Not only cable cars, but also avalanche protection systems must operate reliably to guarantee uninterrupted ski resort operations. The Bergbahnen Sölden (Austria) therefore rely on equipment and services from Inauen-Schätti, with infrastructure upgrades currently underway.

Gondola with a Whirlpool: The Idea and Technical Design

Cableway & Technology|

A gondola as a floating spa experience: What initially sounds very unusual would actually be technically feasible according to Paul Demschar from the Montanuniversität Leoben - and could become an exclusive added feature for select destinations. By smartly separating stationary water treatment from mobile bathing technology, he safely brings whirlpools to the rope. An inside look at the concept and its implementation.

RELEVANT
TOPICS

LATEST
SI-URBAN

Italy: New inclined elevator to the university

Cities|

The new inclined elevator between Trento and the Mesiano university campus in Italy is entering the final stage of the project. The glazed panoramic cabin is already positioned alongside the line, and the initial performance tests have been successfully carried out. When will the system go into operation, and what are its key technical features?

RELEVANT
TOPICS

SEILBAHNEN
INTERNATIONAL
PRINT ARCHIVE

Go to Top